BRIEF
- INSTALLATION OF MACHINES IN WORKSHOP 1, 2, 3, AND 4 OF HIGHER INSTITUTE FOR PLASTICS.
- THE MACHINES WERE IMPORTED BY THE OWNER OF THE PROJECT
- “TECHNICAL & VACATIONAL TRAINING CORPORATION
- THE WORKS INCLUDED DOWNLOAD THE MACHINERY FROM THE CONTAINERS
- WITH SPECIALIZED TECHNICAL EXPERTS
- WITHOUT DAMAGING THE MACHINES
- TRANSPORTING THE VERY HEAVY AND HUGE MACHINES
- INSIDE THE WORKSHOP
- MAKING ELECTRICAL AND CALBE NETWORK
- AIR COMPRESSED NETWORK AND COLD WATER PIPING NETWORK
- SPECIAL FOUNDATIONS
- DRAINAGE CHANNELS ETC FOR THESE SPECIALLY IMPORTED MACHINES.