BRIEF
- THE IS THE 3RD AND 4TH PHASE OF INFRASTRUCTURE OF THE AL-JOUF UNIVERSITY
- SCOPE OF WORK INCLUDE
- EXCAVATIONS
- LEVELLING
- LAYING OF UNDERGROUD MV CALBES
- ELECTRICAL NETWAORK
- SUBSTATIONS
- POWER LINES
- MANHOLES SWITCHGEAR BUILDINGS
- EMERGENCY GENERATOR BUILDING.